Port of Everett has selected contractor ̽»¨ºÏ¼¯ to begin maintenance dredging of the Jetty Landing Boat Launch in January 2022.
The $1 million project will remove up to 41,000 cubic yards (cy) – equivalent to about 4,000 dump trucks loads – of river sediment that has settled in the launch basin and is impeding boaters at low tide. The work is expected to last through mid-February. See Port of Everett News below.